Bodega progress and starting House foundation

The Solar Bodega continues to rise higher and higher


As the Solar Bodega goes up they have to stop after getting a meter high and let the mortar set.  So now work has started to speed up on the preparation of the foundation for the house expansion.   In the background, North of the house is what's left of an old palapala house that the former owner used for chickens.  It was leaning bad, so I had my helpers remove all the materials and roof so we could put some new post in and straighten it up.   Soon, I'll put a new palm roof on it, and in the future it will be for the laying hens, so my breakfast eggs will just be steps away from the kitchen each day.


Normally in house or building construction you'd order a large dump truck full of sand or gravel.  In the pueblo, the trucks have to get into many small areas, as they do here for me.  So instead of bulk loading the material in a large truck, they load it in bags and carry the bags out.  






 

Comments

Popular posts from this blog

Machines don't remember my name

Fresh pork ribs from the pueblo in Yucatan Mexico

Oh! That cow is going to die tonight?